
Update 9/3/2004:
Sander and Ruby also in ABC
Sander and Ruby have also
arrived in the afternoon in ABC. The Sherpas are working on the ropes. It has
been nice but now it snows enormously. The plan is still Sunday or Monday to
move to 7000 meters.
Dispatches
On the Tibet Side of Everest, a Dutch Team will attempt the mountain.
The Dutch team is
Werner de Jong (expedition leader)
Marc Streefkerk (climber)
Mark Thijssen (climber)
Boris Krielen (climber)
Sander Arens (climber)
Ruby Arens-Halfschepel
with another climber joining the expedition...
Few expeditions are successful in Autumn on Everest as compared with the
success in the Spring. See here for a classic Autumn expedition reports:
Autumn Everest 2002
 |
Altitech2:
Digital Altimeter, Barometer, Compass and Thermometer. Time/Date/Alarms.
Chronograph with 24 hour working range. Timer with stop, repeat and up
function. Rotating Bezel. Leveling bubble. Carabiner latch. E.L. 3 second
backlight. Water resistant. 4" x 2-1/4" x 3/4" 2 oz. Requires 1 CR2032
battery.
See more here. |
|
|

|
|