 | 
 4/20:
Hello friends, We are again in base camp after 3 nights spent outside the BC
(2 in the face and one in ABC). Yesterday had been a real difficult day for
the worst weather condition of the month and for the high technical
difficulties climbed on the rocky part of the face. Dry tooling, mix climbing,
low visibility and 10 cm of fresh snow, had been the ingredients of the last
day spent on the north face of Baruntse. We climbed (Camos and I) 70% of the
most difficult and technical part of our route. Tomorrow Denis and Boris will
climb on the fix rope and resolve the last 30 % of the high difficulties
before reaching the ice plateau at 6300 meters. They also will move the tent I
fixed at 5900, higher... Than they will come back and after rest we (Camos,
Denis and I) will start for the summit attempt, climbing the last 800 meter of
face in alpine style. Follow us...., Simone & C:
  
 
Dispatches
 |
Altitech2:
Digital Altimeter, Barometer, Compass and Thermometer. Time/Date/Alarms.
Chronograph with 24 hour working range. Timer with stop, repeat and up
function. Rotating Bezel. Leveling bubble. Carabiner latch. E.L. 3 second
backlight. Water resistant. 4" x 2-1/4" x 3/4" 2 oz. Requires 1 CR2032
battery.
See more here. |
|
|

|
|  |